API Signal installs fleet GPS trackers, dash cams and telematics for businesses in Norcross and Peachtree Corners, at the yard, the loading dock or the owner's driveway, from Jimmy Carter Boulevard to Technology Park. We install for trades running 1 to 10 vehicles, distributors and plant fleets, technician vans, and the crews that work the downtown rail crossings and the Holcomb Bridge Road corridor.
Two cities share one commute here. The Census Bureau puts Norcross at 19,086 residents in July 2025, up 10.9% from the 2020 base, on 6.15 square miles, and Peachtree Corners at 42,519 on 16.11 square miles. Peachtree Corners lies north of Norcross, with seven miles of the Chattahoochee River as its northern and western edge. A contractor who works out of one is in the other by lunch, so we plan the two as a single territory.
Peachtree Corners is a business city, and its economic development page shows how many trucks that implies. It counts more than 2,300 businesses and ranks the largest employers, from Intuitive with 831 employees and Siemens Industry with 687 down to Overhead Door Company of Atlanta (339), Capstone Logistics (331), Ryerson & Son (330) and Savannah Distributing Company (255). Wholesale trade provides 11.5% of local jobs, ahead of retail at 7.3%, from the 2015 Census.
Norcross has the older industrial ground. Waffle House is headquartered here, and a fiber optic cable maker, Lightera, formerly OFS, runs a plant beside the 106-acre Jimmy Carter Boulevard site that Gwinnett County bought from it. The city is also its own power company: Norcross serves about 5,000 electric customers over 84 miles of line, with a division of eleven people that includes metering, and belongs to MEAG Power, a public authority of 49 Georgia communities.
That mix puts every kind of vehicle on the same few roads. Electricians, plumbers, HVAC crews and landscapers run 1 to 10 vehicles out of Norcross, Berkeley Lake and Peachtree Corners, while distributors, logistics operators and line and tree contractors send heavier trucks down the same Holcomb Bridge Road.
Every major platform, installed for the vehicles and roads Norcross and Peachtree Corners fleets really have: box trucks over downtown tracks, vans in Technology Park and a 70,000-vehicle interchange.
Hardwired trackers on vans and pickups, diagnostic-port units on box trucks and flatbeds, and geofences around the places these trucks really stop: Technology Park yards, the Jimmy Carter Boulevard corridor, each downtown rail crossing and the loop at Spalding Drive.
Road-facing dash cams that record the signal, the gates and the track ahead, driver-facing units only where wanted, and rear and side cameras on box and route trucks that back into loading docks.
Lytx, Motive, Samsara, Netradyne, Verizon Connect, CalAmp, Geotab and more, with PTO, boom and door inputs on line, tree and service bodies, and zone reports for the interchange and the work zones that make a drive look slow.
Give the interchange its own zone and its own baseline. Gwinnett County's September 22, 2026 proclamation says the I-85 and Jimmy Carter Boulevard diverging diamond moves more than 70,000 vehicles daily, and the county's earlier closure notice called it Gwinnett's second diverging diamond and the third in Georgia. Traffic switches to the left side of the road to make its turns onto the ramps, so every pass brings a crossover and a signal. A fleet that uses Exit 99 several times a day can collect idle minutes and sharp-turn flags there that say nothing about the driver.
We draw a zone around the interchange, run a week of real drives through it, and set the idle timer and cornering threshold from what it shows. In March 2026 the county asked for proposals on the 106-acre Gateway Gwinnett site, bought from Lightera, formerly OFS, which keeps its plant next door. Proposals could include housing, office, retail or industrial space, and the county later moved the deadline to June 12. Any build on 106 acres brings loads of fill, pipe and concrete, so for a contractor we set one geofence per active site and report arrival, dwell and departure for each load.
Put a geofence on each downtown crossing and an alert on any vehicle that stops inside it. A Norfolk Southern line runs through the middle of Norcross. On November 15, 2016 a family's moving truck stuck on the Holcomb Bridge Road crossing and a freight train hit it. In January 2018 a moving truck stuck at Holcomb Bridge Road and South Peachtree Street was split in two by a train, and no one was hurt. The city has also sent an alert for a truck stuck at the Rowan Street crossing, between Thrasher Street and South Peachtree Street, and told drivers to use Holcomb Bridge Road or Park Drive instead.
The dash cam is the second half. A road-facing unit mounted high on the windshield records the signal, the gates and the track ahead with time and speed on every clip. Crossings also change without notice. In 2019 crews closed the Holcomb Bridge Road crossing for about three months and raised the ground on its west side, and on one Wednesday in April 2025 Norfolk Southern closed Langford Road for four hours for emergency crossing repairs. A live map and a stopped-in-zone alert let dispatch call a driver at the moment a vehicle stops on the tracks.
The plan removes the test lane and restripes the road for ordinary traffic. Technology Parkway runs about 1.4 miles from Spalding Drive to Peachtree Parkway through the 500-acre park, and the city turned it into an autonomous vehicle test corridor. Its plan removes the autonomous lanes and the rubber stoppers called armadillos and returns the road to two travel lanes. In June 2026 the city said construction would begin in July and last about six months, with milling and paving, new striping and landscaped medians near Scientific Drive, Research Drive, Engineering Drive, Spalding Drive and Peachtree Parkway. A city official said no road would close and single-lane periods would stay outside rush hour.
May Mobility launched fully driverless service on Technology Parkway on February 12, 2025, in Toyota Sienna vans on weekdays from 9:30 a.m. to 3:00 p.m., the hours when service vans and delivery trucks are out in the park. A road-facing dash cam shows who yielded, where and at what speed. A corridor geofence times each pass through the work zone apart from the rest of the route, so a week of single-lane delays shows up as a number a dispatcher can quote.
Rebuild the baseline from the first clean week and compare every route against it. On December 2, 2025 GDOT removed two left turns from Spalding Drive onto Holcomb Bridge Road: westbound Spalding to southbound Holcomb Bridge, and eastbound Spalding to northbound Holcomb Bridge. A driver heading south turns left at the Wetherburn Way signal, then left again onto Holcomb Bridge Road, and a driver heading north does the same at River Exchange Drive, with new left-turn lanes built at both signals. Every van that used to turn at Spalding drives a loop, so trip times from before the change understate the drive.
East Jones Bridge Road is the second change. Gwinnett County closed it on June 1, 2026 between Waterside Parkway and Hallbrook Drive for up to four months to replace the bridge over Farrell Creek, and its page listed a late 2026 finish for the project. The posted detour was Peachtree Parkway, Peachtree Corners Circle and West Jones Bridge Road, so a crew serving the Waterside or Orchards neighborhoods saw its trip time change. We set a geofence on each change, record a week of trips and give dispatch the new average, so arrival windows are quoted from measured times.
Gwinnett County from the Chattahoochee to I-85, and the next towns over:
Plant dock, tech park lot, shop or driveway, from the river to the interstate: the vehicles stay put and we come to them.
Yes. A two-van electrician and a six-truck landscaper get the same installer, the same testing and the same choice of platform as a large fleet. If you searched dash cam installation near me for a handful of vehicles, we plan one visit to the shop lot or the driveway, typically 3 to 5 days out, and the vehicles are tracking and recording before we leave.
Netradyne, CalAmp, Samsara, Motive, Geotab, Verizon Connect, Lytx and more. We are independent and we install the system you have chosen, whether that is a tracker alone or a tracker with road-facing and driver-facing dash cams. We also offer equipment, so the hardware can arrive with the installer if you want it supplied.
Yes. We work across Gwinnett County and into DeKalb and north Fulton, from the Chattahoochee to Lilburn. Vehicles kept in more than one town are planned as a single job, so a fleet that sleeps in Doraville and works Peachtree Corners is finished in one pass.
Yes. The city runs its own electric system, about 5,000 customers over 84 miles of line, and line and tree crews on a system like that work from bucket trucks with booms, outriggers and PTO-driven hydraulics. We wire those inputs so a report shows time at the pole, not only time on the road.
No. A city official said every road would stay open, with single-lane periods only outside rush hour, so a yard near Research Drive or Scientific Drive would stay reachable. We schedule around your vehicles, and an installer completes 15 to 20 vehicles in a day on a basic GPS job.
Tell us what trucks you run, where they park and which mornings suit you, and we will be at your yard before the crews leave.
Tell us your vehicle count, vehicle types and platform, and we will get back to you within 24 hours.
Answer a few quick questions and we will build your custom quote in minutes.
Get a Quote