API Signal installs fleet GPS trackers, dash cams and telematics for businesses in Lawrenceville and eastern Gwinnett County, at the yard, the hangar lot or the owner's driveway, from Collins Hill and Hamilton Mill to Dacula and Grayson. We install for trades running 1 to 10 vehicles, service and contractor trucks, line and tree crews, and the fleets that work Buford Drive and SR 316 every day.
Lawrenceville is the Gwinnett County seat, in a county that has passed a million residents. The Census Bureau puts the city at 32,822 people in July 2025, up 7.1% since 2020, and Gwinnett County at 1,018,099, with a mean commute just over half an hour in both. Electricians, HVAC and plumbing companies, roofers, landscapers and builders running 1 to 10 vehicles are the everyday work here, working from the city or from the unincorporated addresses around it.
Health care and education anchor the middle of the city. Lawrenceville's 2045 comprehensive plan sets out to grow the medical cluster around Northside Hospital Gwinnett and to keep Georgia Gwinnett College growing as a college town. The college opened in 2006, covers about 250 acres off SR 316 and Collins Hill Road, and enrolls more than 12,000 students. The contractors who keep buildings like these running work from vans and service bodies.
Light industry and aviation fill the east side. The same plan aims to attract light industrial businesses near SR 316, and Gwinnett County Airport, Briscoe Field, covers about 500 acres northeast of the city, with about 300 based aircraft, almost 200 hangars, more than 50 aviation tenants and a 6,000-foot runway. The trades that build and maintain hangars and light-industrial buildings drive the same corridors as the commuters.
Government and utilities add their own vehicles. The county's 2020 major-employer list shows Gwinnett County Public Schools at 21,396 employees and county government at 5,676 authorized positions, and Jackson EMC lists Lawrenceville as one of its engineering and operations centers. Past the city line, Dacula (6,882 residents in 2020) and Grayson (4,730) send the same tradespeople along SR 316 and SR 20.
Every major platform, installed for the vehicles and roads Lawrenceville fleets really have: pickups and service bodies that sleep at the owner's house, line and tree trucks, and a state route with intersections of its own.
Hardwired trackers on pickups, cargo vans and service bodies, pass-through harness units on medium-duty trucks kept in a yard, a home-address geofence for every truck that sleeps off the lot, and a corridor geofence on SR 316 between Collins Hill Road and Harbins Road.
Road-facing dash cams for the SR 316 intersections, driver-facing units where wanted, and backup cameras and side cameras for bucket trucks, dump trucks and box trucks that back into hangar lots, campus loading areas and tight driveways.
Motive, Verizon Connect, Samsara, Lytx, Netradyne, Geotab, CalAmp and more, with power take-off and boom inputs on line and tree trucks, door sensors on van and service bodies, and arrival-time reports for dispatch on home-game evenings and storm callouts.
Up to two lettered business vehicles per residence, and no commercial vehicles, under the city's zoning ordinance. Section 200.3.15 allows a maximum of two business vehicles per residence, with ladders removed while they are parked there, and prohibits commercial vehicles in every residential district. The definitions section, which cites an ordinance adopted on September 22, 2025, treats any car, SUV, truck or van with an exterior logo or lettering as a business vehicle, and treats a vehicle with a gross vehicle weight rating of 10,001 pounds or more as commercial.
That sorts a Lawrenceville trade's trucks into two groups, and we set up the platform to match. The rating is printed on the door-jamb label, so we record it when we register each vehicle, then draw a home-address geofence for every driveway truck and a yard geofence for the heavier ones, with an overnight report listing where each vehicle slept. The install happens where the truck sleeps, in the driveway before the crew leaves or in the yard, so no truck leaves its route for us.
Measure the corridor, because its stops are on the state's project list. The SR 316 freeway section ends at the SR 20, SR 124 and Collins Hill Road interchange, and the road east of it has intersections at Hi Hope Road, Hurricane Trail and Winder Highway. A GDOT project list for the corridor names new interchanges at all three, plus a new roadway linking Fence Road to Winder Highway, and the Hi Hope project was reported at $132 million in 2023. In December 2024 Gwinnett County voted to relocate utilities for Hi Hope, with state construction scheduled for 2025. The Harbins Road interchange farther east opened in 2022.
We set a corridor geofence from Collins Hill Road to Harbins Road and run a minutes-in-zone report by hour, which prices the stops in crew time before anything changes. Idle thresholds sit above the length of a red light, so signal waits do not fill the idle report, and a road-facing dash cam records the approaches where fast traffic meets a stop. When an interchange opens, the same report shows what it gave back.
A time stamp for every arrival, every boom lift and every return to the yard. Jackson EMC serves ten counties and 278,998 meters, 135,868 of them in Gwinnett, the largest share of any county it lists, and its locations page names Lawrenceville as both a district office and an engineering and operations center. The same page says line crew staff must live within 25 miles of their assigned office. Line and tree crews working that territory run bucket trucks, diggers and chippers.
We wire the power take-off and the boom-position switch to tracker inputs, so the report separates driving, working and idling, and we add an arrival geofence for each outage address that dispatch can draw in a minute. A geofence on the contractor's yard times the run to the first pole, a backup camera covers the blind corner when a bucket truck backs into a driveway, and a dash cam clip answers a downed-line claim.
They add a wave of traffic to Buford Drive before every first pitch. Gwinnett Field, called Coolray Field through the 2025 season, sits at 2500 Buford Drive on SR 20 between I-85 and SR 316 and holds 10,427 for baseball. Gates open one hour before first pitch, Tuesday through Sunday, so 5:00 p.m. for a 6:05 start, 5:30 for a 6:35 and 6:00 for a 7:05, with event parking in lots around the park.
A service company with an afternoon on that stretch should be finished before the gates open, so we draw a geofence around the park and run a time-of-day report on it, which shows which jobs ran into the crowd. Dispatch can then move those stops earlier. We book the morning for installs at yards near Buford Drive.
Gwinnett County, and the roads east along SR 316 and SR 20:
Yard, hangar lot, campus loading area, shop or driveway, from Buford Drive to Harbins Road: the trucks stay where they are and we come to them.
Yes. A plumber with three vans and a landscaper with six trucks get the same wiring, testing and setup as a large fleet. We normally plan one visit, at the driveway, the yard or the shop. An installer completes 15 to 20 vehicles a day on a basic GPS job, and scheduling is typically 3 to 5 days out.
Netradyne, Lytx, Samsara, Motive, CalAmp, Geotab, Verizon Connect and more. We are independent, we install the system you have chosen, and we also offer equipment. If you search for dash cam installation near me or fleet GPS tracker installation near me in Gwinnett, we come to your yard.
Yes, along with Collins Hill and the rest of Gwinnett County. Dacula is about 6 miles east of Lawrenceville on Business 29, and Grayson is about 5 miles south on SR 20. Vehicles kept in several of those places are planned as one job, with a route that keeps driving between them to a minimum.
It does not change how we install. It changes where the trucks sleep, and we install there. For unincorporated Gwinnett, the county's zoning code lets a home occupation keep one business vehicle used by the resident, limited to a car, pickup, van or SUV (Section 210-140.9). It also requires outdoor storage of equipment and materials in industrial districts to be fully screened by a solid wood fence, masonry wall or slatted chain link fence at least 8 feet high (Section 211-90.11).
It could, when the road opens. Gwinnett County describes Phase II as a limited-access road of about 7 miles from SR 20 (Buford Drive) to SR 316, with interchanges at I-85, SR 124, Fence Road and SR 316. We build zones that can be redrawn in minutes when a road opens.
Tell us which trucks you run, where each one sleeps and which mornings suit your crews, and we will be at your driveway or yard before they leave.
Tell us your vehicle count, vehicle types and platform, and we will get back to you within 24 hours.
Answer a few quick questions and we will build your custom quote in minutes.
Get a Quote