Three Plus cables skip the diagnostic port and connect behind the dash. They are for specific truck makes, and each one comes with its own panel work.



Motive's list of Plus cables describes three direct-connect cables. VCBL-D-VOLMC is for Volvo 2013 to 2018 and Volvo or Mack 2019 and newer. VCBL-D-MACK is for Mack 2013 to 2018. VCBL-D-FRGHT is for Freightliner 2017 and newer. Motive's examples include a Volvo VAH (2020), a Mack Anthem (2019), a Mack Pinnacle (2017), a Mack CXU (2016), a Freightliner M2 (2019) and a Freightliner SD122 (2021). Vehicles with an RP1226 connector use VCBL-Y-1226 instead.
Ends: P1 to the vehicle adapter, P2 to power and ground on Volvo or Mack 2019 and newer, P3 to power and ground on Volvo 2013 to 2018, P4 (female) to the terminating resistor and P5 (male) to the J1939 bus connector.
1. Remove the fuse panel on the center-right of the dash (2019 and newer) or the access panel at the top center of the dash (Volvo 2013 to 2018).
2. On 2019 and newer, use the DL1J1939 connector in the center console, not DL3J1939, which looks identical.
3. Remove the terminating resistor from the J1939 bus connector and keep it. Motive says to put it back correctly, because a wrong install may cause truck malfunctions.
4. Connect P5 to the J1939 connector where the resistor was, and put the resistor on P4.
5. Route the power cable to the front dash panel and remove it to reach the battery connector. On 2019 and newer, plug P2 into one of the two F87 connectors. On Volvo 2013 to 2018, plug P3 into the battery power connector, red to power and black to ground. Motive tells you to cap the unused power end with its cover to prevent shorting.
Ends: P1 to the vehicle adapter, P2 ring terminals for power and ground, P3 (female) to the terminating resistor and P4 (male) to the J1939 bus connector.
1. Remove the access panel at the top center of the dash, to the right of the steering wheel.
2. Remove the terminating resistor from the J1939 connector. Motive says not to discard it.
3. Connect P4 where the resistor was and put the resistor on P3 to close the circuit.
4. Fit the ring terminals on two studs in the access panel. Red goes on the Power stud, which may be labeled Battery or Battery Fuse, and black goes on Ground. Do not put the red terminal on the stud labeled Ignition.
Ends: P1 to the vehicle adapter, P2 to the power and ground splice packs and P3 to the J1939 250K TEM splice pack.
1. Remove the outer dash bezel (nine T25 screws), the instrument panel (eight T25 screws and the red and yellow knobs if present), the passenger dash panel (two T25 screws) and the top panel (nine T25 screws), keeping each set in a labeled cup.
2. Find the J1939 250K TEM splice pack near the center dash, typically SP2. Remove the grey grommet, connect P3 to the CAN interface and put CAN_H and CAN_L in the yellow and green sections.
3. Connect the black ground wire to the GND splice pack and the red wire to the Power Battery splice pack from the P2 end.
Plug the vehicle adapter into P1 and the Plus camera cable into the adapter. Test and mount the camera with the AI Dashcam Plus install guide, on the windshield or the left side of the rearview mirror. Start the engine, and when the alert, or right, light turns blue, the camera is powered on and connected. Some vehicles need panel changes to route the cable to the top of the dash. If the panels cannot be changed, mount the adapter inside the panel and keep the cable from being pinched.
Cable lengths. Use each cable's own guide for the steps. Motive's VOLMC guide refers to a P3 cap in one step and a P2 cap in another, so read the labels on the cable before you cap anything.
VCBL-D-MACK.
It sits on the J1939 bus connector, and Motive says it must be reattached correctly on the cable, because an improper install may cause truck malfunctions.
VCBL-D-FRGHT.
Sources: Motive help center, AI Dashcam Plus Cables and the VCBL-D-VOLMC, VCBL-D-MACK and VCBL-D-FRGHT install guides, read Nov 25, 2026
Tell us how many vehicles you run and what you want to see, and we will match you to the right Motive devices and the install that goes with them.
We Supply It. We Install It. One Call.