API Signal installs fleet GPS trackers, dash cams and telematics for businesses in Marietta and across central and east Cobb County, at the yard, the shop or the owner's driveway, from the Square and Cobb Parkway to Delk Road and the I-75 exits. We install for trades running 1 to 10 vehicles, paving, delivery and utility trucks, service fleets that support the aircraft plant, and crews that work on both sides of the CSX line.
The Census Bureau puts Marietta at 63,574 residents in July 2025, up 4.1% since April 2020, on 23.43 square miles. Cobb County had 793,345 residents and 22,148 employer establishments in 2023. Behind those numbers are electricians, plumbers, HVAC companies, roofers and landscapers with 1 to 10 vehicles, whose owners type dash cam installation near me because they want the work done where the van is parked.
Aerospace is the local heavy industry. In June 2026, on the plant's 75th anniversary, the Governor's office said Lockheed Martin had added over 1,200 jobs since 2019 at its 8-million-square-foot Marietta facility. The C-130J Super Hercules is the plant's main product, and it also builds the center wing assembly for the F-35. Air Force Plant 6 sits at Dobbins Air Reserve Base, and the I-75 exit at Delk Road is signed for Lockheed and Dobbins.
The rest of the traffic comes from a broader employer list. MEAG Power's 2026 profile of Marietta names C.W. Matthews, Tip Top Poultry, XPO Last Mile Logistics, Atlanta Beverage Company, Red Hare Brewing, Birla Carbon and WellStar Health Systems among the major employers.
The city also runs its own utility. Marietta Power was created by the city in 1906 and serves more than 45,000 electric customers, and MEAG Power says the city provides and maintains water, electricity and solid waste services. Line, water and sanitation trucks, and the contractors who work for them, use the same streets as the trades.
Every major platform, installed for the vehicles and routes Marietta fleets really have: pickups with trailers, dump trucks and utility bodies, and crews that cross the CSX line every day.
Trackers on service vans and pickups, hardwired units on dump trucks and utility bodies, self-powered trackers on equipment trailers, and geofences on the Big Chicken junction of Cobb Parkway and Roswell Road, the Delk Road corridor and the CSX crossings, so dispatch can see where a day went.
Road-facing dash cams that record a night crossing on Whitlock Avenue or a lane change on Cobb Parkway, driver-facing units where wanted, and rear and side cameras for dump trucks and utility bodies backing into tight yards and job sites.
Motive, Samsara, Verizon Connect, Lytx, Netradyne, Geotab, CalAmp and more, with engine data read from the vehicle network, bed, PTO, boom and outrigger inputs on paving and utility bodies, and axle and trailer details kept on each vehicle record for the express lanes.
Only vehicles without a trailer, and only up to two axles and six wheels. Peach Pass's FAQ says that vehicles with trailers and tractor-trailer trucks are not allowed, and that vehicles with more than 2 axles or 6 wheels are not allowed, except over-the-road buses. At Marietta the Northwest Corridor lanes are entered at Terrell Mill Road, just south of the Delk Road exit, and at Roswell Road, between the two SR 120 exits. Peach Pass lists the approximate hours as southbound 1 a.m. to 11 a.m. and northbound 1:30 p.m. to 11 p.m., Sunday through Friday, with southbound all day Saturday.
A pickup towing an equipment trailer lands on the wrong side, while the same pickup alone is judged on its own axles and wheels. So at install we record axles, wheels and hitch on each vehicle record, put a self-powered tracker on every trailer, and set geofences at both access points, so a report shows who used the lanes and who sat beside them. Peach Pass wants its transponder inside and center on the windshield, 3/4 inch from the center of the mirror and 2 inches from the top, with any other tag at least 2 inches away. That is the same patch of glass a road-facing dash cam wants, so we plan the two together before anything is fixed down. Peach Pass words the wheel limit more than one way, so a dual-rear-wheel truck's wheel count stays on file.
Plan on 24 to 48 hours per crossing, and treat the dates as movable. CSX's freight line between Atlanta and Chattanooga runs a block west of Marietta Square. In December 2024 the city announced closures at East Dixie Avenue, Waverly Way, Whitlock Avenue, Mill Street, Polk Street, Kennesaw Avenue and Marble Mill Road, each expected to take 24 to 48 hours. On December 5 the city said the planned downtown crossing work was postponed, and that only the East Dixie Avenue work would go ahead. Its notice for Marble Mill Road scheduled that crossing to close from September 21 to 25, 2026, while CSX crews replace it.
Whitlock Avenue had night work in fall 2026. GDOT began resurfacing it on September 21, working overnight from 9 p.m. to 5:30 a.m., Monday through Saturday, from John Ward Road toward North Marietta Parkway, and planned to continue through December 21, weather permitting. A crew that left before 5:30 a.m. or returned after 9 p.m. met that work zone. We put geofences on the crossings and the work zone, so a morning report shows the minutes lost at each, and we schedule installs at the yard in daylight, before the crews roll.
The bed, the tailgate and the plant gate, so the platform knows when a truck is loaded and when it is dumping. C.W. Matthews, headquartered in Marietta, describes itself as one of the Southeast's leading designers and producers of hot-mix asphalt, with 30 fully owned-and-operated asphalt plants throughout Georgia and asphalt production among its services since the 1950s. Hot-mix is delivered hot and has to be laid before it cools, so the minutes between the plant and the paver matter more to a paving crew than the miles.
On a dump truck we wire a bed-up input and a tailgate input, draw a geofence around each plant gate and each job site, and add a rear dash cam for backing to a paver. The trip report then reads plant departure, arrival, dump and return. Night paving, like the GDOT job on Whitlock Avenue, runs from 9 p.m. to 5:30 a.m., so we install on those trucks in the afternoon, before the shift starts.
Measure each corridor before the work and again after it. Cobb DOT's $7 million Lower Roswell Road project, paid from the 2011 SPLOST, runs from Woodlawn Drive to Davidson Road. Part of it is a raised median between Johnson Ferry Road and Davidson Road, which business owners called a bad idea. Cobb commissioners also approved a $2.3 million Johnson Ferry Road and Shallowford Road intersection project on September 22, 2026, with a schedule listing design from March 2027 and substantial completion in September 2028.
A raised median ends left turns across traffic, so a stop on the far side of the road becomes a loop to the next opening. We put a geofence on each yard entrance and each job stop along those roads, and the trip report shows the added minutes and miles after the median and the new lanes go in. That shows whether a route really changed.
Central and east Cobb County, and the neighbors on every side:
Yard, shop, plant lot or driveway, from the Square to the I-75 exits: the vehicles stay put and we come to them.
Yes. A single van gets the same wiring and the same end-of-job test as a full lot. For a fleet of 1 to 10 we normally plan one visit to the shop or the owner's driveway. Owners searching fleet GPS tracker installation near me in Marietta usually get a date about 3 to 5 days out, and an installer completes 15 to 20 vehicles a day on a basic GPS job.
Verizon Connect, Netradyne, Motive, Samsara, Geotab, Lytx, CalAmp and more. We are independent, and we install the system you have chosen. We also offer equipment, so a fleet that has not picked a platform yet can get the hardware and the installation in one visit.
Yes, and Powder Springs, Austell, Mableton, Acworth and Woodstock too. We work throughout Cobb County and metro Atlanta, and vehicles kept at more than one yard are planned as a single job, so a Marietta shop with a satellite lot in Kennesaw or Smyrna is done on one visit.
At your own yard, shop or driveway, so the vehicle reaches the plant already reporting. The Governor's office describes Lockheed's Marietta facility as 8 million square feet, and the Delk Road exit on I-75 is signed for Lockheed and Dobbins. A contractor with vans parked on a lot near Delk Road has the trackers installed there, and the vans leave with the data already flowing.
Not by itself. A March 2026 notice from GDOT and the city announced an April 1 open house on North Marietta Parkway between Fairground Street and Church Street: four 11-foot travel lanes, protective left-turn lanes, medians, sidewalk upgrades and a multi-use path. The notice gave no construction schedule. Fleets with yards along that stretch can set up a baseline report, then compare times once work begins.
Tell us what trucks and trailers you run, where they park and which mornings work, and we will be at your Marietta yard before the crews leave.
Tell us your vehicle count, vehicle types and platform, and we will get back to you within 24 hours.
Answer a few quick questions and we will build your custom quote in minutes.
Get a Quote